'NO WAY'
2008 | 14.90m
Sealine T50
Yacht for Sale
€390,000 VAT Paid
| Location: | Europe |
|---|---|
| Length: | 14.90m |
| Builder: | SEALINE |
| Year: | 2008 |
| Guests: | 6 |
| Staterooms: | 3 |
NO WAY Description
The Sealine T50 ‘No Way’ is the perfect entry-level flybridge with 3 good-sized cabins and both bow and stern thrusters making her super easy to manoeuvre. This model also has a great added benefit of having an extendable cockpit which can be expanded at the touch of a button.
Key Features
- 3 guest cabins on a 50-footer
- EU VAT paid
- Plenty of upgrades in 2024
- Bow and Stern thruster for easy maneuvering
- Bright interior
WELCOME ABOARD
The interior is full of natural light due to the clever inclusion of forward skylights in the saloon and forward VIP cabin.
The Master cabin is full-beam and comfortable at the centre of the hull.

A spacious flybridge and foredeck make this boat ideal for family fun. Please do contact us for further information.

CONTACT THE BROKER
Specifications
Main Dimensions
| LOA: | 14.90 m |
|---|---|
| Beam: | 4.58 m |
| Draft: | 1.62 m |
| Displacement: | 46.50 T |
| Gross Tonnage: | 46.50 GT |
Construction
| Builder: | SEALINE |
|---|---|
| Model: | Sealine T50 |
| Hull and Superstructure: | GRP |
| Year: | 2008 |
| Flag: | Malta |
Speed
| Cruising Speed: | 21 Kn |
|---|---|
| Maximum Speed: | 29 Kn |
Accommodation
| Guests: | 6 |
|---|---|
| Staterooms: | 3 |
Engines
| Main Engines: | 2 x Volvo Penta D9 575 |
|---|---|
| Engine Hours: | 773 h |
| Total Power: | 1150 HP |
| Generators: | 11 KvA Kohler |
| Generator Hours: | 668 h |
Tanks
| Fuel Tanks: | 2080 l |
|---|---|
| Water Tanks: | 517 l |
LAYOUTS



GALLERY
UPGRADES
- Radar( 2024)
- Plotters upgraded (2022)
- AIS( 2024)
- 2 new ACs in galley area (2024)
- New water pump, wash down hose at bow and stern (2024)
- New grill on flybridge (2024)
- New cooler on flybridge (2024),
- New fridge in galley (2022)
- New headlining in galley area (2024)
- Full set of winter covers (2023)
- Rebuild of port gearbox (2023)
- New oil cooler for port engine (2023)
- Clean out of all coolers in 2023/4 and replacement of both fuel lift pumps (2023)
- New grey water tank for showers (2024)
- New flybridge VHF (2024)
- Polish of topsides throughout July (2024)
- New windlass (2023)
- Hull was sanded down to zero with a boero basecoat (2024)
- New underwater lights (2024)
- New lower-unit for bow thruster (2024)
- New engine sound proofing (2023)
- Engine service to be done in November (2024)
- All batteries replaced (2022)
- Interior wrapping (2024)
- New smart (2024)
- New Washer/Dryer (2023)
- New bilge pump and gear pump (2024)



















































































